Re: Fixed set up time in semifinished product costing

$
0
0

Hi,

 

Yes, set up change in sfg.

 

The lot size in Semi finished is 1,000 kg, in cost estimate, setup time is fixed (80 min) regardless change the lot size to, 500 Kg, 2000 kg, etc.

 

The lot size for my fg is 1,000 kg and the qty of sfg required is 1,458 kg. the setup time for sgm should be 80 min but systme is calculating more minutes.

 

The pass on lot size it's off.

 

The formula in formula key SAP001 is standar "SAP_01".


Regards!!