Basically what I want is during the Production Order confirmation all the materials/components to be pulled from the Storage Bin B and not from Storage Bin A (as it is now)
↧
Basically what I want is during the Production Order confirmation all the materials/components to be pulled from the Storage Bin B and not from Storage Bin A (as it is now)