Quantcast
Channel: SCN: Message List
Viewing all articles
Browse latest Browse all 3019

Dept. Code is inconsistent, Please verify MRP Controller of every PR Items

$
0
0

Hi All,

 

I am facing the issue in client side, While converting from PR to PO, I have got an error

 

Dept.code is inconsistent, Please verify MRP controller of every PR items.

 

I have checked in the SAP help, But it shows no documents available,  i have also checked the PR release strategy where MRP controller is configured, But i am not sure i can add the MRP controller in the release strategy or not Please help me to solve this issue.

 

 

Thanks

Manoj


Viewing all articles
Browse latest Browse all 3019

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>